Second Level Framing
Grading Harvested Lumber
Here is the video of the trees we harvested being graded prior to being able to use structurally.
Ground Level Framing
Boardwalk Supports
Pouring Slab
Footing Drainage Pipe
Processing Timber
We will be repurposing the trees felled from the infill lot. This lumber will be used both inside and outside, on the Burnside Boardwalk project. There was initially 21 large trees on the Burnside Boardwalk infill site. We were able to save 8 of them. The trees varied in sizes from a large of 44 […]
Dry-Well
Our drywell allows the rainwater runoff to recharge the local aquifer, rather than adding to the city’s stormwater overflow. This is one of the features that help make Burnside Boardwalk so green. In a normal urban environment rainwater is channeled into the city drainage system that pushes the water directly to streams bypassing the traditional means that […]
Pouring Footing
When pouring the footing and retaining walls in a small infill lot there are several obstacles to overcome. We would prefer to use a boom truck so that the filler hose does not need to be dragged across the forms. But when the lot is torn up there is not always room for the boom […]